Plasma Cutting

Categories:News & Stuff, Uncategorized

With our state of the art ultra sharp plasma cutter, we can speed up or production rates whilst reducing the cost of our services to our customers.

Ultra sharp plasma cutting is a new process developed using the latest advances in plasma, control system and program integration.

Our Kerf high definition plasma cutting machine with UltraSharp technology cuts to what many accept as being of a laser quality. The process produces superior hole quality and excellent edge finish.


Staircase Feature!

Categories:News & Stuff

GLW recently completed a stunning staircase in Terrington, Norfolk. The process included designing the staircase, fabricating it and installing it.

From start to finish we hope you’ll agree that it is a stunning example of our capabilities.


Merry Christmas!

Categories:News & Stuff, Uncategorized


We would like to take this opportunity to thank all of our customers for their custom this year!

Our Christmas opening hours are:

Closed from Jan 23rd December, Returning 5th January.


GLW Now Has CE Certification

Categories:News & Stuff

GLW is extremely proud and pleased to announce that it has passed CE certification and approval.

This now means that we can provide:

  • All Structrual steel Specification in conjunction with NSSS 5th Edition (CE Marking Version), Specification Form GLW120
  • All Bolts to Specification NSSS 5th Edition (CE Marking), EN 1090, Specification form GLW121
  • Hot dipped galvanising must be in accordance with BS EN ISO 1461

What we’ve been up to lately!

Categories:News & Stuff


We fabricated and fitted new handrails and balustrading to the entry and exit of the new Happisburgh Building  at the City Collage in Norwich.



Market Deeping

We have been helping to extend the existing mezzanine flooring at the Empire Gym by supplying and fitting the new steel support work to the front elevation of the gym.
2014-05-02 12.37.53 2014-05-02 12.32.24 2014-05-02 12.32.16 2014-05-02 12.32.11


Recent Work


Its been a busy start to the year for GLW below is just a small selection of the projects we have been busy working on:

Stainless Window installed in Brabraham Cambridge

2013-12-03 11.49.44 2013-12-03 11.49.55

Klee Clamp Handrail Installed At Wells Next To Sea

 2014-02-12 19.05.12 2014-02-12 19.05.11 2014-02-12 19.05.09 2014-02-12 19.05.06

 Handrail for offices in Peterborough

2013-12-23 10.07.19 2013-12-23 10.07.082013-12-23 10.07.23

Handrail completed at Tempsford – 42mm Grade 316 with 3mm wire system

 2014-01-16 13.21.45 2014-01-16 13.24.20 2014-01-16 13.24.36 2014-01-16 13.24.54

Staircase installed in a house in Terrington

2014-01-21 09.42.37-1 2014-01-21 09.43.12

Merry Christmas!


We would like to wish all of our customers a very Merry Christmas and a Happy New Year.

Our  Christmas opening hours are:

CLOSED from Dec 23rd to Jan 2nd 2014

Check out some of our latest work at the John Deere Showroom in Swineshead

Categories:News & Stuff

The below staircase was recently completed at the Brand new John Deere Showroom in Swinsehead Lincolnshire






DSCF5723 DSCF5724 DSCF5733

Check Out Our Latest Flyer!

Categories:News & Stuff, Uncategorized

View Our Latest PDF Flyer Here!


GLW complete integration of new steel staircase at Huntingdon company


GLW have completed a project to provide staircase access to an elevated platform usually only accessed via a ladder. The stairs will provide safer access to the platform and assist in Health & Safety compliance.